Wednesday, July 17, 2013

finished looted wagon/big trakk and progress on mekboy junka commission

As the title suggests I have reached a point where I can say I'm happy with the wagon/trakk. I also finished the kustom force field array on mekboy junka as well as added some extra propulsion to represent the overcharged engine. All that's left now is to add more rivets.










Monday, July 15, 2013

Looted Wagon/Big Trakk progress

well I got some work done on one of the tanks I've had sitting on my desk.





All I have left to do is add some tread plate in the passenger compartment, close up the crew compartment and possibly enclose the passenger compartment.

Sunday, July 14, 2013

In repair mode

Sorry I haven't been posting as much as you probably would like. I've been working on getting my entire army into battle-worthy shape. that might not seem like to much of a job but trust me when you have all the projects going on that I do it's a bit overwhelming.

Here is my current list of Things to fix/finish in order of time required
Battle Krawler
Gargant (lots of things need done)
Big Mek Battle Fortress (lots of things need done)
Converted Kill-krusha (more armour plates, more exhuast stacks, fix the loading arm)
Looted Wagon or Big Trakk (I'm not sure what it should be yet, needs finished)
Big Trakk with Supa Kannon ('ard case needs repaired and then armour plates and crew added, )

Mekboy Junka (Need to make 3 twin linked big shootas, a third scorcha, 3 kustom mega blastas)
Battlewagon with supa kannon (need to fix the treads on it)
Various minor repairs on nobz and boyz
2 converted mega dreads
1 converted meka dread

Here is my Current list of models that I need to build,  not in any particular order.
47 Mega nobz (4 squads of 10 and a squad of 7)
at least 8 lootas
20 more tank bustas
3 more burna boyz
Figure out what to build with baneblade kit
Figure out what to build with giant (19" long) toy tank
12 boyz
6 battlwagons (all but one will be conversions or scratchbuilds I just can't afford 5 more brand new BW Kits)

And Finally here is a list of my Commissions
70% Completed mekboy junka
2 unstarted flakk trakks
23 lootas (waiting on additional boy models from the client to finish these)

obviosly the commissions are taking priorty but I can't devote 100% of my modeling time to the commissions. I have to switch it up a bit.

Monday, July 1, 2013

It's been more than a month!?

Has it really been more than a month already? How could I possibly make it up to you.






I know!
 LOTS OF PICTURES!